Industry: Power plants

Project: CFB – Power plant Anda

Location: Mabalacat, Pampange City – Philippines

Client: Formosa Heavy Industries Corp., Taiwan

Scope: Single-stranded fluidized bed system as a turnkey new plant for the combustion of petroleum coke.
The plant is currently under construction. The scope of supply for SL includes engineering, material delivery, installation and dry-out

Refractory: 600 tons

Year: 2015

Duration: approx. 5 months

Manpower peak: Planning 60